en ru

17-01-2019

Planned Maintenance of the Marian B


Kulevi Port’s access channel needs to be dredged for the purpose of providing the appropriate water depth for large vessels to pass.

 

The dredger MARIAN B is a self-propelled and self-dumping dredger with a length of 77 m, a width of 12.9 m, a maximum draft of 6.2 m, and a hold capacity of 1,700 m3. The vessel is also equipped with two suction pipes with an excavating depth of 16m and a performance of 1,600 m3 per hour. The ship ensures that the maintenance of depth for tankers is DWT 100,000 t. The MARIAN B has been operating in Kulevi port since 2005.

 

Kulevi Oil Terminal constantly takes care of the dredger’s technical condition. That’s why we signed a contract with a reliable company so that docking and repair work can be carried out on the vessel regularly.

 

Dry docking work will be conducted in February which includes the cleaning of freeboard and bulwark, hull treatment, and the replacement of anodes.

 

The good working condition of the vessel will help the company maintain its safe and efficient operational processes.

Все публикации

Фотогалерея

<

Пишите нам:

ОТПРАВИТЬ