07-07-2017

Automatically Controlled Railway Operation System


Black Sea Terminal management periodically conducts upgrades and the modernization of the automatically controlled railway system, which contributes to the safety and throughput of the terminal’s railway routes and Kulevi railway station.

 

The terminal’s internal and external railway routes are 12 km long, where switching between different routes is performed by 27 railway switching points. In 2016, BST has initially installed the centralized automatically controlled system for the main switching points.

 

Recently the terminal completed the installation of the centralized automatically controlled system of other switching points, which will contribute to the control of the switching points from the central railway control room; enhance safety of railway traffic and maneuvering operations; improve the throughput of the railway tracks and Kulevi Station; and eliminate time losses related to the routes lineup. 

 

All News

Photogallery

<

E-mail us:

SEND